RECENT NEWS ABOUT OUR PROJECTS

Enviroplumb UK Ltd ensures top quality work of the highest standard.

Enviroplumb Takes Pole Position

Enviroplumb staff took advantage of a well-deserved Go Karting experience at Team Sport Karting – Leeds recently. 
Staff raced the 40 MPH Go Karts against each other including the MD over three 15 minute circuits before taking to the podium for a team photo. 

Enviroplumb team strike a pose

Enviroplumb staff became models for the day for the company’s photoshoot. Managers, installers and office staff joined in with the opportunity to catch up with each other away from their day to day activities. The day involved 9 vehicles, 15 staff, turkey trays as homemade oil drip trays, Santa hats and lots of smiles. 

Bradford City Park was chosen as the iconic landmark to celebrate Enviroplumbs Bradford heritage. Staff made the most of the winter sunshine to pose for the photos, celebrating with a well-earned drink afterwards.

Enviroplumb supports local charity to bring Christmas cheer to local children

Enviroplumb is bringing a smile to underprivileged local children by supporting The Bradford Cinderella Club. 

The club exists to assist local underprivileged children to take part in activities in the same way as their more fortunate school mates. 
Staff helped out at Bradford Cathedral recently through donating and making up shoe boxes full of gifts for local kids. 

Over 797 boxes were made up by volunteers including Enviroplumb staff for distribution to less fortunate children and thanks to the support of Enviroplumb suppliers we donated Pantomime tickets for a group of children to see Peter Pan at the Alhambra Theatre.

Isaac Brown, Contracts Manager said: “We are a Bradford company and wanted to help local children who are less fortunate through the Bradford Cinderella Club. The staff thoroughly enjoyed themselves in the splendour of Bradford Cathedral and really got into the Christmas spirit making up shoe boxes.” 

Julie Pearson, Applications Secretary said: “Without the help of local companies and individuals Bradford Cinderella Club would not be able to fulfil its own remit of funding underprivileged children as we have been for over 125 years. The generous donation of Pantomime tickets from Enviroplumb will play its part in our task of continuing to put smiles on children’s faces.”

Chrisharben Court Apartments – Bradford

Enviroplumb is installing plumbing, heating and drainage works at a new development of nine, two bed apartments for Jade Homes Construction Ltd. 
The works includes design and build of the plumbing and drainage system for the apartments and supply and fit of sanitaryware. 

Cheapside Chambers Apartments – Bradford

Enviroplumb is installing plumbing, heating and drainage at Cheapside Chambers Apartments for Cullion Developments. 

The conversion from offices to residential apartments in the heart of Bradford city centre includes design & build and supply & fit for the development comprising of studios, one and two bedrooms apartments.

Enviroplumb previously installed the plumbing, heating and drainage for the second floor and are delighted to progress works on the first and third floors. 

Works include installing the sanitaryware for the bathrooms and pipework for the kitchens.

The development is due for completion in July 2017. 

Installation nears completion at prestigious York development

Enviroplumb is completing second fix plumbing for a residential development of 10 dwellings for Headoffice3. 

The former Eastfield Farm and outbuildings in York have been transformed into high specification dwellings with Enviroplumb installing the plumbing, heating, ventilation and drainage throughout. 

The development incorporated a mix of existing buildings and new build extensions and required pipework installation around period features including oak beams. 

The works required plumbing of cold and hot water services for kitchens, bathrooms and utility rooms. Drainage pipework included acoustically lined soil pipes and ventilation including ducting and mechanical extraction from bathrooms and kitchens. The installation also included installation of high efficiency underfloor heating throughout and high capacity unvented hot water cylinder with zoned heating.   

Second fix plumbing included installation of designer bathroom suites to include rain maker showers, thermostatic mixer controls and toilets with soft close seats. 

Headoffice3 Site Manager, Dan Scott Said: “Enviroplumb have worked hard to ensure all aspects of the plumbing and heating are installed to an exceptionally high standard, it would be a pleasure to have Enviroplumb work on my next project.” 

Costa Coffee Drive Thru – Doncaster

Enviroplumb is installing first fix plumbing at the new Costa Coffee Drive Thru for A Pollick Ltd. The new 1800 sq ft Costa Coffee Drive Thru at Lakeside Village Outlet in Doncaster includes installation of hot and cold pipework, toilet systems and 4” waste pipes. 

Second fix installation will be completed shortly ready for the Christmas deadline including supply and fit of sanitaryware.  

The development marks over 100 Costa Coffee shop installations across the UK by Enviroplumb.

EXCEEDING EXPECTATIONS...

Plumbing contractors covering all aspects of plumbing and heating installation in the UK
For plumbing and heating installations nationwide, contact Enviroplumb UK Ltd in Bradford today on 01274 689 729
Call us